links for 2010-05-26

  • "Wave Hub on course for summer deployment
    17 May 2010

    Wave Hub, the pioneering marine energy project, is on course to be deployed this summer with fabrication of sub-sea cables and the hub itself nearing completion.

    Wave Hub will create the world’s largest test site for wave energy technology by building a grid-connected socket on the seabed, 10 miles off the coast of Cornwall, to which wave power devices can be connected and their performance evaluated."

    (tags: no_tag)
Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s